![Konica Minolta BIZHUB C250 Скачать руководство пользователя страница 211](http://html1.mh-extra.com/html/konica-minolta/bizhub-c250/bizhub-c250_user-manual_1993370211.webp)
3
Basic copy operations
3-78
C250
Basic copy op
er
at
ions
Chapter 3
3.14
Scanning the next document to be copied while a
copy job is being printed (next job reservation)
The settings for the next copy job can be specified and the document can be
scanned while a copy operation is being performed so that it can be printed
once the current copy operation is finished.
To reserve a copy job
0
Up to 61 copy jobs, including the current copy job, can be reserved.
0
A copy job can be reserved after scanning of the loaded document is fin-
ished. A copy job cannot be reserved while a document is being scanned.
0
If Utility Setting parameter “Copy Operating Screen” is set to “ON”, [Pro-
gram Next Job] appears. Touch [Program Next Job], and then specify the
copy settings for the next copy job.
For details on specifying the “Copy Operating Screen” parameter, refer
to “Display setting” on page 12-18.
0
For details on positioning the document, refer to “Feeding the document”
on page 3-7.
0
To cancel a reserved copy job, display the Basic screen for the reserved
copy job, and then press the [Stop] key. For details, refer to “Performing
operations on jobs” on page 11-6.
1
Press the [Start] key to begin scanning and outputting the current copy
job.
–
The Basic screen for reserving a copy job appears.
c250.book Page 78 Tuesday, April 4, 2006 11:33 AM
Содержание BIZHUB C250
Страница 1: ...User s Guide Copy Operations ...
Страница 55: ...Introduction x 54 C250 c250 book Page 54 Tuesday April 4 2006 11 33 AM ...
Страница 74: ...2 Before making copies Chapter 2 Before making copies c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 134: ...3 Basic copy operations Chapter 3 Basic copy operations c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 215: ...3 Basic copy operations 3 82 C250 Basic copy operations Chapter 3 c250 book Page 82 Tuesday April 4 2006 11 33 AM ...
Страница 216: ...4 Additional copy operations Chapter 4 Additional copy operations c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 256: ...5 Troubleshooting Chapter 5 Troubleshooting c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 308: ...6 Specifications Chapter 6 Specifications c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 318: ...7 Copy paper original documents Chapter 7 Copy paper original documents c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 346: ...8 Application functions Chapter 8 Application functions c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 460: ...10 Care of the machine Chapter 10 Care of the machine c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 470: ...11 Managing jobs Job List Chapter 11 Managing jobs Job List c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 488: ...12 Utility Chapter 12 Utility c250 book Page 1 Tuesday April 4 2006 11 33 AM ...
Страница 585: ...12 Utility 12 98 C250 Utility Chapter 12 c250 book Page 98 Tuesday April 4 2006 11 33 AM ...
Страница 586: ...13 Appendix Chapter 13 Appendix c250 book Page 1 Tuesday April 4 2006 11 33 AM ...