UAB KOMFOVENT we reserve the right to make changes without prior notice
V-C5.1_21-01
21
VERSO sections connection using clamping elements
View B
View C
View A
The sections clamping elements are supplied to the device. They are used in the front and back of
the unit in the upper part of the section. Sections are tightened with screws in the frame holes (image
A). Tightening the two equal in height single-flow sections clamping elements are located on the top of
section, and if allows unit construction, on the sides of the section (image B). First, the individual elements
are screwed on the same height on the two different sections, and then using the clamping screw and nut
sections are joined (view C). Prior to joining all the sections must be sealed with a gasket 12×6 (supplied
to the device).
Cleaning and Inspection of Coil Heat Exchanger
Always clean against the regular direction of airflow. Make sure that the coils are purged of air. If a
droplet eliminator is fitted, remove it and fush it clean with water. Also check that the condensate drain
is not clogged.
Содержание VERSO Pro P
Страница 1: ...VERSO PRO S R P RHP PCF INSTALLATION AND MAINTENANCE SERVICE MANUAL EN ...
Страница 2: ......
Страница 50: ......
Страница 51: ......