3.
When the idling time reaches 30 seconds before the set
time, the machine monitor returns to the standard screen
and changes to the countdown screen.
If one of the following operations is performed according to
the screen instructions, the machine monitor stops count-
down and the screen returns to the standard screen.
• Increase the engine speed.
• Place the gear shift lever to any position other than
NEUTRAL position (N).
4.
If the idle state is further continued and the countdown
reaches 0 seconds, the engine stops.
At the same time, the parking brake is applied.
Turn the unnecessary switches to OFF position to prevent
the battery to run out.
REMARK
When restarting the engine, turn the starting switch as
usual.
When the auto idle stop operates while the parking brake
is in “TRAVEL” position, set the parking brake switch to
"PARKING" position and then to “TRAVEL” position again,
and the parking brake is released.
AFTERTREATMENT DEVICES REGENERATION
Each item of “Aftertreatment Devices Regeneration” menu
screen is for settings and operations of the aftertreatment devi-
ces regeneration.
SCR INFORMATION
Each item of “SCR Information” menu screen is for displaying
information related to SCR and DEF.
EXPLANATION OF COMPONENTS
OPERATION
3-80
Содержание HD325-8
Страница 2: ......
Страница 13: ...FOREWORD INTRODUCTION 1 11 ...
Страница 25: ...LOCATION OF SAFETY LABELS SAFETY SAFETY LABELS 2 3 ...
Страница 26: ...SAFETY LABELS SAFETY 2 4 ...
Страница 61: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 275: ...Brake performance Downhill distance 450 m Tire size 18 00R33 OPERATION MACHINE OPERATIONS AND CONTROLS 3 215 ...
Страница 276: ...Brake performance Downhill distance 600 m Tire size 18 00R33 MACHINE OPERATIONS AND CONTROLS OPERATION 3 216 ...
Страница 277: ...Brake performance Downhill distance 900 m Tire size 18 00R33 OPERATION MACHINE OPERATIONS AND CONTROLS 3 217 ...
Страница 278: ...Brake performance Downhill distance 1500 m Tire size 18 00R33 MACHINE OPERATIONS AND CONTROLS OPERATION 3 218 ...
Страница 281: ...Brake performance Downhill distance 450 m Tire size 21 00R33 OPERATION MACHINE OPERATIONS AND CONTROLS 3 221 ...
Страница 282: ...Brake performance Downhill distance 600 m Tire size 21 00R33 MACHINE OPERATIONS AND CONTROLS OPERATION 3 222 ...
Страница 283: ...Brake performance Downhill distance 900 m Tire size 21 00R33 OPERATION MACHINE OPERATIONS AND CONTROLS 3 223 ...
Страница 284: ...Brake performance Downhill distance 1500 m Tire size 21 00R33 MACHINE OPERATIONS AND CONTROLS OPERATION 3 224 ...
Страница 340: ......
Страница 341: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 424: ......
Страница 425: ...SPECIFICATIONS 5 1 ...
Страница 429: ...ATTACHMENTS AND OP TIONS Before reading this chapter read and understand the SAFETY 6 1 ...
Страница 447: ...REPLACEMENT PARTS 7 1 ...
Страница 463: ......
Страница 464: ...HD325 8 HD405 8 Dump Truck Form No EENAM03582 2018 KOMATSU All Rights Reserved Printed in Belgium 06 2018 ...