
258
ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER
5 - Levering with the tool after driving it into the material to be
broken.
6 - Hitting the ground with the hammer bit.
7 - Lifting the machine by levering on the hammer bit with the
bucket cylinder completely extended.
RWA29260
RWA30770
RWA06500
Содержание Avance WB91R-2
Страница 2: ......
Страница 12: ...10 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Страница 21: ...SAFETY AND ACCIDENT PREVENTION ...
Страница 23: ...SAFETY NOISE AND VIBRATION PLATES 21 RWA30460 RWA00020 RWA00020 RWA00190 RWA00030 RWA37700 RWA00160 RWA00150 ...
Страница 56: ...54 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Страница 57: ...THE MACHINE AND ITS OPERATIONS ...
Страница 124: ...122 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Страница 159: ...MAINTENANCE ...
Страница 229: ...TECHNICAL SPECIFICATIONS ...
Страница 238: ...236 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...
Страница 239: ...AUTHORISED OPTIONAL EQUIPMENT ...
Страница 280: ...278 THIS PAGE WAS INTENTIONALLY LEFT EMPTY ...