OPERATION
OPERATION
3-128
INSPECTION AND REPAIR
3
Frequent inspection and prompt repair will reduce repair costs.
The following items for inspection will serve as a guide to maintenance service of each undercarriage part. Per-
form periodical inspection and contact the Komatsu distributor in your area when machine has approached repair-
able limits and reversing limits.
MEASURING LINK PITCH
1.
Insert a wooden block between track shoe and sprocket to
take up the slack in track shoes.
2.
Measure pitch length of 4 links in stretched portion at least
2 links away for master pin. Of length obtained, 1/4 is the
link pitch.
REMARK
Basic link pitch (P): 228.85 mm
Bushing turning limit link pitch
Heavy-duty: 231.85 mm
Standard: 233.85 mm
There is no link window on the master link.
MEASURING HEIGHT OF GROUSER
After taking up slack in track shoes, measure height at center
of shoe as shown below.
Basic dimension (h): 80 mm
Repair limit: 25 mm
Master link
Содержание 76243
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 5: ...FOREWORD FOREWORD 1 3 q Machine equipped without cab Back pocket of operator s seat ...
Страница 16: ...NECESSARY INFORMATION FOREWORD 1 14 ...
Страница 17: ...FOREWORD NECESSARY INFORMATION 1 15 ...
Страница 24: ...CONTENTS 1 22 ...
Страница 28: ...SAFETY LABELS SAFETY 2 4 SAFETY LABELS 2 POSITIONS OF SAFETY PICTOGRAMS 2 ...
Страница 211: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 289: ...SPECIFICATIONS 15 ...
Страница 294: ...HEADREST HANDLING ATTACHMENTS OPTIONS 6 4 HEADREST HANDLING 6 Use the headrest fully pushed in to the lowest position ...
Страница 297: ...INDEX 17 ...
Страница 298: ...INDEX 7 2 ...
Страница 301: ...COLOPHON 18 ...
Страница 302: ...COLOPHON 8 2 D155AX 5 GALEO BULLDOZER Form No EEAM023402 2005 KOMATSU All Rights Reserved Printed in Belgium 09 05 ...