OPERATION
OPERATION
3-115
DIGGING UP BOULDERS
3
During the ripping operation, if boulders are found which are difficult to break and shoe slippage occurs, dig up the
boulder as follows.
1.
Depress the decelerator pedal and lower the engine speed
to a point where there is no shoe slippage.
2.
Operate the ripper lever to the TILT position and carry out
ripping and digging.
3.
If there are boulders which are impossible to break or dig
up with the tilt operation, move forward slightly and tilt the
shank back, then operate the tilt again and dig up the boul-
der.
4.
Even when the operation in Step 3 is repeated, if it is
impossible to break or dig up the boulder, drive back about
10 cm, raise the shank, avoid the rock or boulder that can-
not be ripped, then drive forward and start ripping again.
Содержание 76243
Страница 2: ......
Страница 3: ...FOREWORD 11 ...
Страница 5: ...FOREWORD FOREWORD 1 3 q Machine equipped without cab Back pocket of operator s seat ...
Страница 16: ...NECESSARY INFORMATION FOREWORD 1 14 ...
Страница 17: ...FOREWORD NECESSARY INFORMATION 1 15 ...
Страница 24: ...CONTENTS 1 22 ...
Страница 28: ...SAFETY LABELS SAFETY 2 4 SAFETY LABELS 2 POSITIONS OF SAFETY PICTOGRAMS 2 ...
Страница 211: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 289: ...SPECIFICATIONS 15 ...
Страница 294: ...HEADREST HANDLING ATTACHMENTS OPTIONS 6 4 HEADREST HANDLING 6 Use the headrest fully pushed in to the lowest position ...
Страница 297: ...INDEX 17 ...
Страница 298: ...INDEX 7 2 ...
Страница 301: ...COLOPHON 18 ...
Страница 302: ...COLOPHON 8 2 D155AX 5 GALEO BULLDOZER Form No EEAM023402 2005 KOMATSU All Rights Reserved Printed in Belgium 09 05 ...