Construct the Stud Framing (cont.)
If installation is over water-resistant wall material,
insert wall anchors where bridging was added
between the studs and secure the shower receptor nailing flange to the wall.
2. Install the Plumbing
Locate the drain according to the dimensions shown above. Measure and cut the drain hole opening
in the floor and install the rough drain lines.
Install the rough plumbing at the dimension shown above. The rough plumbing should be installed
before the unit is installed.
Sterling
7
1100676-2-F
Содержание Sterling 2375 Series
Страница 25: ...Guide d installation Douche néo angulaire Sterling Français 1 1100676 2 F ...
Страница 50: ...Guía de instalación Ducha neo angular Sterling Español 1 1100676 2 F ...
Страница 75: ...1100676 2 F ...
Страница 76: ...USA 1 800 STERLING 1 800 783 7546 México 001 877 680 1310 SterlingPlumbing com 2014 Kohler Co 1100676 2 F ...