14. Install the Bulb Seal and Conectors
Install the Bulb Seal
Trim the bulb seal 2
″
(51 mm) shorter than the slot length.
Slide the bulb seal down into the slot on the strike side fixed panel frame. It should be 1
″
(25 mm)
below the top edge of the slot when fully installed.
Install the Connectors
NOTE:
To ease installation, install the connectors while the panel is laying horizontally on the packaging.
This prevents the 8-32 nuts from sliding in the slots of the side fixed panels.
NOTE:
The hole in the connector should be closest to the outside of the shower as shown. This is critical
for shower door installation.
Place the connector against the face of the angled edge of the side fixed panel.
Insert an 8-32 x 1
″
screw through the connector.
Slide an 8-32 nut into the slot on each side frame of the side fixed panel.
Tighten the screw, connector, side frame and nut, ensuring the connector remains in-line with the
fixed panel.
Repeat the steps with each of the three remaining connectors.
Nut
Screw
Nut
Screw
Connector
Slot
Bulb
Seal
Bulb
Seal
Slot
Bulb
Seal
Correct
Alignment
NO
#8-32 x 1"
Sterling
17
1100676-2-F
Содержание Sterling 2375 Series
Страница 25: ...Guide d installation Douche néo angulaire Sterling Français 1 1100676 2 F ...
Страница 50: ...Guía de instalación Ducha neo angular Sterling Español 1 1100676 2 F ...
Страница 75: ...1100676 2 F ...
Страница 76: ...USA 1 800 STERLING 1 800 783 7546 México 001 877 680 1310 SterlingPlumbing com 2014 Kohler Co 1100676 2 F ...