B. Partially Install Bath Drain

Install the drain on the bath according to the drain

manufactuer's instructions.

B.

UNIT: mm

:

INSTALL THE BATH

INSTALL THE BATH

4

tiling

bath

silicone filler

wall

2

4

silicone filler

bath

wall

tiling

1

2

bath

silicone filler

wall

4

3

A2. Through the Floor Drain Bath

Installation

1 . Slide the new bath into position to verify the drain

location and the stud fit. Cut a minimum 152

305

mm hole in the floor for the drain connection.

)

A2.

1 .

152

305mm

)

A1. Installation of Bath with Adjustable

Hlight

Slide the new bath into position.

Insert the drain tailpiece into the trap.

Level the bath by positioning metal shims and bricks

under the bath feet and ensure there is enough spate

for the drain. Attention: the metal shims are necessary

to aroid cracking of bricks. Check for level along the top

of the side of the bath and across the drain end. The

bath may have to be moved in and out of the recess

area until it is shimmed properly, if the support feet are

not accessible from the back or side.

A1.

:

Metal shim

Level

Brick

116867-T01-B

Содержание PRELUDE K-8266T

Страница 1: ...me of publication Kohler China Ltd reserves the right to make changes in product characteristics packaging or availability at any time without notice These instructions contain important care cleaning...

Страница 2: ...ole location in the flooring B 110 118mm C Accessory Information Grip Rail K 8645 CP C K 8645 CP INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS B Materials Required Plumbers putty Wall coverings...

Страница 3: ...the enamel finish must be followed WARNING Failure to follow the manufacturer s recommended installation method may result in damage to the enamel surface Do not use sharp objects or metal tools when...

Страница 4: ...e floor for the drain connection A2 1 152 305mm A1 Installation of Bath with Adjustable Hlight Slide the new bath into position Insert the drain tailpiece into the trap Level the bath by positioning m...

Страница 5: ...b to support the weight of the tub until the mortar hardens Wedges will remain in the mortar Frequently check the level of the tub 25 30 NOTE B Install Plumbing CAUTION Risk of damage to bath bottom a...

Страница 6: ...ut a ledge is desired the finished apron wall surface must be 2 mm under the bath rim 1 Corner Installation The suggested framing construction is illustrated 1 2 Recess Installation The suggested fram...

Страница 7: ...gly to secure the grip rail Snap the cap 9 into each hole Repeat above procedures for the other grip rail K 8645 CP 6 7 8 9 COMPLETE FINISH WALL COMPLETE FINISH WALL CAUTION Risk of product damage Do...

Страница 8: ...pH 3 8 Housekeeping Responsibilities The Safeguard slip resistant surface on this bathtub meets or exceeds the requirements of ASME ANSI slip resistance Improper maintenance or cleansers may permanent...

Страница 9: ...after purchase Implied warranties including that of merchantability and fitness for a particular purpose are expressly limited in duration to the duration of this warranty Kohler China disclaims any...

Отзывы: