10
1333238-W2-A
4
3
2
1
Wall Bracket
Make sure that the pipework has been
installed correctly and that it protrudes
25 mm from the finished wall surface.
Hold the wall bracket in position and
mark the position of the fixing holes.
Drill the fixing holes using an 8 mm
diameter drill.
Fit the plastic pipe guide over the inlet
pipes. Level the pipe guide and secure
to the wall to hold in position.
Leave the
guide in place and finish the wall.
Installation of the Bar Valve Fast Fix Kit
Before installing the pipework, please ensure that there is a minimum of 1260 mm
height clearance to allow for the rigid riser and overhead to be installed above. If
installing in a restricted height area, a shorter riser rail can be ordered as a spare part.
25 mm
150 mm
25 mm
8 mm
Plastic Pipe
Guide
HOT
COLD
Содержание Mira Honesty
Страница 2: ...2 1333238 W2 A...
Страница 19: ...19 1333238 W2 A Notes...