B
B
Mark the wall 20mm in from the
front edge of the tray on both
sides.
20mm
INSTALLATION
STEP
1
IMPORTANT:
MUST
Tray
be level
along front edge.
-4-
x3
6mm
x3
x3
x3
0mm
STEP
2
STEP
3
DOOR SIDE:
Fit the door wall channel to the wall.
Wall channel
be
vertical on
the front face.
MUST
NOTE
LH version shown. RH fitting is a mirror image of these instructions.
DOOR SIDE
The door must be
installed with the pivot
by the wall, not the
side panel.
IMPORTANT
Tray must be level in all planes
or door will not install properly.
0mm
Angled section
faces the inside
of the enclosure.
Door Side:
Fit the top and bottom tracks to the wall jamb.
Once fitted ensure structure is supported at all times.
IMPORTANT:
The flat section
of track should
face upwards at
the top and
face down at
the bottom.
Top
Bottom
20
1120770-T01-C