Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don’t
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Tools and Materials
Before You Begin
CAUTION: Risk of personal injury or product damage.
Handle
with care. Vitreous china can break or chip if the product is
handled carelessly.
Observe all local plumbing and building codes.
Carefully inspect the new urinal for damage.
Roughing-in remains the same when using the optional 3
″
outlet
spud.
Fixture dimensions are nominal and conform to tolerances by
ANSI Standard A112.19.2.
Site preparation may require additional tools and hardware.
Adjustable
Wrench
Safety
Glasses
Tape
Measure
Thread
Sealant
Levels
Blade
Screwdriver
Pencil
• Hole Cutting Equipment
Plus:
1/4" Ratchet
1048744-2-B
2
Kohler Co.