2. Install the Urinal
Reference the installation template to properly position each wall
hanger at its proper vertical dimension above the outlet hole. To
allow for vertical adjustment, place the initial screws through the
center of the slots on the hangers.
Apply thread sealant tape to the pipe threads on the drain and
install the collar to the drain.
Place the gasket onto the collar with the beveled surface facing
away from the collar.
CAUTION: Risk of personal injury or product damage.
Handle
with care. Vitreous china can break or chip if the product is
handled carelessly.
Carefully position the urinal on the wall hangers.
Verify the urinal is properly positioned, then remove the urinal
from the wall.
NOTE:
If adjustment is necessary, make vertical adjustments along
the slots on each wall hanger until the urinal can be tightened to the
collar.
Install the permanent screws into the holes on the wall hangers,
as shown on the installation template.
Secure the urinal to the collar using the washers and bolts
provided.
Apply sealant
tape.
Strainer
Gasket
Bolt
Washer
Collar
Drain
Installed Wall Hangers
Wall
Wall Hangers
1048744-2-B
4
Kohler Co.