1. Prepare the Site
Concrete Construction
NOTICE:
Adequate floor support must be provided. Consult the roughing-in sheet packed with your
whirlpool for specific floor loading requirements.
CAUTION: Risk of product damage.
Do not support the whirlpool by the rim.
Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is
flat and level.
Install an access panel to allow the pump to be serviced.
Construct brick or concrete supports.
Provide a 1/16
″
(2 mm) gap between the whirlpool rim and the concrete or brick framing. Frame
the floor, or construct a frame for a raised installation, in accordance with the roughing-in
information packed with the whirlpool.
Position the plumbing according to the roughing-in information packed. Cap the supplies, and
check for leaks.
Optional apron may be used or you may use
brick or concrete with an approved tile backing.
Typical access
panel
Corner Installation
Install an access panel to allow
the pump to be serviced.
Kohler Co.
5
1022405-2-C
Содержание K-1315
Страница 46: ...1022405 2 C...
Страница 47: ...1022405 2 C...
Страница 48: ...USA 1 800 4 KOHLER Canada 1 800 964 5590 M xico 001 877 680 1310 kohler com 2004 Kohler Co 1022405 2 C...