Parts supplied:
Ø8.0mm
●
Prior to installation check that all parts have been supplied.
●
Assemble bath on a mat to protect against damage to bath surface.
●
Bath diagram shown below is for reference only and bath legs fit to all baths.
●
This product requires a two person lift - use proper lifting techniques.
●
This installation guide does not include details of waste connection; final decision about installation of waste connection should
be taken by a suitably qualified person.
●
Follow each step in turn.
4x
4x
4x
4x
4x
8x
4x
8x
4x
1
2
1x
M10 *50mm
M5 *35mm
4mm
3
4
A
1 - 2
4x
Tools required:
Traditional Leg set
ARCE11 NKL
Extra washers have been provided
if adjustment for the mating of leg
to bath is required.
Do not overtighten