11.9
Section 11
Reassembly
11
Install the counter gear into the pre-oiled bearing
boss in the closure plate, engaging teeth with
gear on crankshaft.
Install the output shaft/gear assembly into the
corresponding pre-oiled bearing boss in the
closure plate. See Figure 11-33.
Figure 11-33. CS8.5-12. Installing Counter Gear and
Output Shaft/Gear Assembly.
5. Install the dowel pins into their respective
locations in the closure plate, and install a new
gasket (dry) onto the dowel pins. See Figures
11-34 and 11-35.
Figure 11-35. CS8.5-12. Installing Dowel Pins and
Gasket.
6. Assemble the cover onto the closure plate,
aligning the dowel pin and hole locations.
7. Install the cover mounting screws and torque to:
CS4,CS6: 10 N·m (88.5 in. lb.)
CS8.5-12: 30 N·m (265 in. lb.)
Figure 11-36. CS4, CS6. Torquing Cover Mounting
Screws.
Figure 11-37. CS8.5-12. Torquing Cover Mounting
Screws.
Figure 11-34. CS4, CS6. Installing Dowel Pins and
Gasket.
Содержание COMMAND PRO CS10
Страница 1: ...SERVICE MANUAL COMMAND PRO CS SERIES 4 12 HP HORIZONTAL CRANKSHAFT...
Страница 20: ...1 18 Section 1 Safety and General Information...
Страница 24: ...2 4 Section 2 Special Tools...
Страница 48: ...6 4 Section 6 Lubrication System...
Страница 54: ...7 6 Section 7 Retractable Starter...
Страница 84: ...8 30 Section 8 Electrical System and Components...
Страница 106: ...9 22 Section 9 Disassembly...
Страница 122: ...10 16 Section 10 Internal Components...
Страница 154: ...ENGINE DIVISION KOHLER CO KOHLER WISCONSIN 53044 LITHO IN U S A FORMNO TP 2503 A ISSUED 12 99 REVISED 8 00 MAILED 9 00...