·
·
·
·
Please read these instructions carefully to
familiarize yourself with the required tools, materials,
and installation sequences. Follow the sections that
pertain to your particular installation. This will help
you avoid costly mistakes. In addition to proper
installation, read all operating and safety instructions.
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning,
and warranty information-
Please provide adequate available space for the
bath unit in accordance with roughing-in. Arrange
the location of drain in advance.
All installations must comply with council and local
authority by-laws. It is the responsibility of the installer
to ensure that the waste is made watertight by means
of silicone sealant or caulking compound.
please leave these
instructions for the consumer.
IMPORTANT:
·
·
·
·
BEFORE YOU BEGIN
BELAY
INSTALLATION INSTRUCTIONS
WALK IN WP
1.3m
K-156T-LCP/K-156T-RCP
K-23769T-LCP/K-23769T-RCP
-1-
SHANGHAI KOHLER LTD.,
NO.368, MIN LE ROAD,
FENG XIAN DISTRICT, SHANGHAI, CHINA
POST CODE: 201419
368
201419
©
©
Copyright Kohler China Investment Co., Ltd. 2019
2019
60
(1524
)
L
K-156T-LCP/RCP
K-23769T-LCP/RCP
CAUTION: Risk of personal injury.
CAUTION: Risk of personal injury.
CAUTION: Risk of personal injury.
CAUTION: Risk of product damage.
NOTICE:
Note:
This bath is
extremely heavy. Obtain sufficient help to
carefully lift or move the bath.
To reduce
the risk of injury, children or people with
infirmities should not be allowed to use this
product without close, continuous supervision.
Do not
remove, adjust, or alter any factory-installed
components of this product unless explicitly
directed to within this installation guide.
Do not
support the bath by the rim.
This bath is designed for either a new
three-wall alcove or an existing alcove for a
standard 60" (1524 mm) bath. For installation in
an existing alcove, gap panels are provided and
will likely require cutting to fit.
K-156T-LCP/RCP is designed for below-
the-floor drain installation. K-23769T-LCP/RCP is
designed for above-the-floor drain installation.
1397340-T01-A