5. Make the Final Connections
Make the final drain line connections.
Make sure the door seal is free of dirt and debris.
Close and latch the door.
Close the bath drain.
Fill the bath to the overflow, and check for leaks.
Drain the bath.
·
·
·
·
·
·
5.
·
·
·
·
·
·
6. Complete the Installation
NOTICE:
Follow the steps that apply to your
installation.
Secure the adjustable feet to the floor with screws or
metal strapping material.
Reinforce the left and right apron edges with small
pieces of blocking or bracket panel K-23772T (the
options) secured to the alcove walls.
·
·
6.
K-23772T
(
)
·
·
·
·
·
·
·
·
Measure and mark the outside edges of the gap
panel so it will fit between the bath and the walls.
Use a cutter to carefully cut the gap panel at the
marked lines.
Carefully install the gap panel into place, fix the gap
panel on the bath with silicone sealant.
Apply a bead of silicone sealant into the gap
between the bath and walls.
Wipe away any excess silicone sealant.
Install the access panels.
·
·
·
·
·
·