e)
Select pebbles K, L & M and arrange along the rear of the
fuelbed, using the ribs in the rear of the fuelbed as a guide for
placement. (See figure 25 below).
Fig. 25
f)
Select the two small pebbles (J & N) and position to fill the gaps at each
end of the third row of pebbles, (See figure 25 below).
The exact position and fit of the pebbles may be finely adjusted to give the most
pleasing and random appearance.
Warning : Use only the pebbles supplied with the fire. When replacing the
pebbles remove the old pebbles and discard them. Fit a complete
set of pebbles of the correct type. Do not fit additional pebbles or
any pebbles other than a genuine replacement set.
To ensure that the release of fibres from these R.C.F (Refractory Ceramic Fibre) articles is kept to a
minimum, during installation and servicing we recommend that you use a HEPA filtered vacuum to
remove any dust accumulated in and around the appliance before and after working on the
appliance. When replacing these articles we recommend that the replaced items are not broken
up, but are sealed within heavy duty polythene bags, clearly labelled as “RCF waste”. RCF waste
is classed as a “stable”, non reactive hazardous waste and may be disposed of at a landfill
licensed to accept such waste Protective clothing is not required when handling these articles,
but we recommend you follow the normal hygiene rules of not smoking, eating or drinking in the
work area, and always wash your hands before eating or drinking.
3.3
FITTING THE TRIM OR CONTEMPORARY FASCIA (ALL MODELS)
a)
The trim is held in position on the fixing flange by magnets.
3.4
FITTING THE FENDER (ALL MODELS)
a)
The fender is placed up to the front of the ceramic front rail on
all models. Position the ashpan under the fender and centralise
26
Pebble K
Pebble L
Pebble M
Pebble J
Pebble N