- 25 -
INSTALLATION
6
) Assemble Hull unit with TD tank
Insert Gum Packing between Hull unit and TD tank.
Use 8 Hex.Bolts (M16x65) to fit Hull unit in TD tank.
Check the performance of hoisting/lowering of the Transducer unit several times while
tentatively clamping with Hex.Bolts and fasten them after the performance is confirmed.
Nut (M16)
Do not apply Adhesive, etc. on the
Gum Packing for Flange.
Spring Washer (
φ16)
Flat Washer
(16 x 32 x 2)
Hex.Bolt
(M16 x 65)
TD tank
Gum Packing for Flange
CAUTION
CAUTION
Fix the Transducer unit cable with a
Nylon Clip.
The sufficient space should be kept
not to disturb the raise/lower of the
the transducer unit.
Apply Grease regularly to the parts
of Gear of Hull unit and Flange
Opening.
CAUTION
Содержание KDS-5000BB
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 20: ...12 INSTALLATION DIMENSIONS PROCESSOR UNIT DPU 510 DIMENSIONS OPERATION UNIT DOU 520 Unit mm inch...
Страница 21: ...13 INSTALLATION DIMENSIONS OPERATION UNIT DOU 520 Unit mm inch...
Страница 22: ...14 INSTALLATION DIMENSIONS JUNCTION BOX DJB 540 Unit mm inch...
Страница 23: ...15 INSTALLATION DIMENSIONS HULL UNIT DHU 530 Unit mm inch...
Страница 105: ...97 OPTION P No Description ESR 1510 Shaft guides ESR 1511 Shaft guides with adjuster G 100 Grease Bath cork...
Страница 111: ......
Страница 112: ......