- 24 -
INSTALLATION
4
) Mount the shaft cap at the end of
TD shaft
Insert the shaft cap into the TD shaft.
Screw it with the cap bolts, M4x25 (4 pcs).
Screw the cap bolts, M4x10 (4 pcs) to prevent slip-out of the shaft cap.
5
) How to tighten the nuts
Lift up the Lock Nut as shown in the drawing. Place the Waterproof Nut on the Flange opening
and tighten it firmly by hand and then make a 180-degree turn with a screwdriver.
Take care not to over a 180-degree. This Lock Nut is to protect loosening the Waterproof Nut.
Screw the Lock Nut tightly with a screwdriver and a hammer.
180゜
<
To be continued
>
Cap Bolt
M4 x 25
Shaft cap
Ensure the bolt position each.
Cap Bolt
M4 x 10
WATER PROOF NUT
After tightening the Water
Proof Nut by hand, use a
Screw Driver to clamp it
further by 180
°
.
LOCK NUT
Содержание KDS-5000BB
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 20: ...12 INSTALLATION DIMENSIONS PROCESSOR UNIT DPU 510 DIMENSIONS OPERATION UNIT DOU 520 Unit mm inch...
Страница 21: ...13 INSTALLATION DIMENSIONS OPERATION UNIT DOU 520 Unit mm inch...
Страница 22: ...14 INSTALLATION DIMENSIONS JUNCTION BOX DJB 540 Unit mm inch...
Страница 23: ...15 INSTALLATION DIMENSIONS HULL UNIT DHU 530 Unit mm inch...
Страница 105: ...97 OPTION P No Description ESR 1510 Shaft guides ESR 1511 Shaft guides with adjuster G 100 Grease Bath cork...
Страница 111: ......
Страница 112: ......