15.
Connect the supply and drain hoses to the PROCESSOR. Ensure that they are not
kinked. If necessary use ELBOW FITTINGS at the PROCESSOR.
16.
If the supply and drain hoses are routed into the DARK ROOM, feed them through
the SMALL SEAL PLATE which is part of the INSTALLATION KIT. This plate ensures
that the cut-out around the hoses is lighttight.
NOTE
If transparent hoses are fed into the DARK ROOM, the DARK ROOM will not be light tight. Cover them
with pieces (approx. 50 cm each) of the black SHRINKING TUBE which is supplied with the SBS INSTAL-
LATION KIT..
17.
If the SBS-SYSTEM is installed with the rear against a wall do step 18 else do step
19.
18.
To avoid displacement of the SYSTEM fix it with the 2 WALL ANCHORS to the wall.
19.
To avoid displacement of the freestanding SBS-SYSTEM turn down the LEVELLING
FEET of the ML700.
20.
If a DFT is to be used, mount the RED/GREEN LED BOX to the wall. Use the
VELCRO STRIP.
WALL ANCHOR
figure 8-6
II 3066-2
KODAK AG, Stuttgart
8-5
10/98
Содержание MULTILOADER 700 PLUS
Страница 12: ...II 3066 2 10 98 1 8 KODAK AG Stuttgart...
Страница 22: ...II 3066 2 10 98 4 2 KODAK AG Stuttgart...
Страница 28: ...II 3066 2 10 98 5 6 KODAK AG Stuttgart...
Страница 48: ...II 3066 2 10 98 7 16 KODAK AG Stuttgart...
Страница 54: ...II 3066 2 10 98 8 6 KODAK AG Stuttgart...
Страница 72: ...II 3066 2 10 98 12 8 KODAK AG Stuttgart...
Страница 76: ...II 3066 2 10 98 13 4 KODAK AG Stuttgart...
Страница 90: ...II 3066 2 10 98 14 14 KODAK AG Stuttgart...
Страница 95: ...II 3066 2 KODAK AG Stuttgart 15 5 10 98...
Страница 96: ...Kodak AG Hedelfinger Str 54 60 70327 Stuttgart Germany Kodak Min R X Omat and X Omatic are trademarks...