1
General Information_________________________________________________ 4
1.1
Foreword _______________________________________________________________________ 4
1.2
Technical standing _______________________________________________________________ 4
1.3
Intended use ____________________________________________________________________ 4
1.4
Technical data ___________________________________________________________________ 4
1.5
Information documented __________________________________________________________ 4
1.6
CE-certification __________________________________________________________________ 4
2
Important Information _______________________________________________ 5
2.1
Safety instructions _______________________________________________________________ 5
2.2
Excess temperature/power failure __________________________________________________ 5
2.3
Low water/excess water pressure___________________________________________________ 5
2.4
A fire hazard ____________________________________________________________________ 6
2.5
Wood fuels, minimum requirements _________________________________________________ 6
2.6
Filling the fuel storage unit ________________________________________________________ 6
2.6.1
By dumping ______________________________________________________________________ 6
2.6.2
By blowing in _____________________________________________________________________ 6
2.7
Correcting malfunctions in the feed systems _________________________________________ 6
3
How the Boiler Plant is Strucured _____________________________________ 7
4
Commissioning/Operation ___________________________________________ 8
4.1
The initial start-up ________________________________________________________________ 8
4.2
Operation _______________________________________________________________________ 8
4.2.1
Heating up_______________________________________________________________________ 8
4.2.2
Operation _______________________________________________________________________ 8
4.2.3
Switching off _____________________________________________________________________ 8
5
Oil burners on a Pyrot _______________________________________________ 9
6
The ECOTRONIC control system _____________________________________ 10
6.1
General information _____________________________________________________________ 10
6.1.1
Replacing the battery _____________________________________________________________ 10
6.2
The functions of the keys_________________________________________________________ 10
6.3
Boiler and loader system (F3/F4)___________________________________________________ 11
6.3.1
The F3 KEY: "PYROT Parameters" __________________________________________________ 11
6.3.2
The F4 KEY: "PYROT Loader System" _______________________________________________ 12
6.4
Extended control systems F5 – F8 (optional)_________________________________________ 13
6.4.1
Room heating system _____________________________________________________________ 13
6.4.2
Utility water heater _______________________________________________________________ 15
6.4.3
Air heater ______________________________________________________________________ 16
6.4.4
Annex buildings__________________________________________________________________ 17
6.4.5
Pipelining ______________________________________________________________________ 18
6.4.6
Additional heat generator __________________________________________________________ 19
6.4.7
Solar __________________________________________________________________________ 20
7
Cleaning/Maintenance ______________________________________________ 21
7.1
Boiler _________________________________________________________________________ 21
7.1
Installing the displacement rods into the heat exchanger ______________________________ 23
7.2
Feed systems __________________________________________________________________ 24
8
Shutdown ________________________________________________________ 24
9
Carrying out disposals _____________________________________________ 24
10 Supplements
- Spec Sheet 1010-1, 2
- Malfunction report/Malfunction correction
Содержание KOB PYROT SERIES
Страница 1: ...Operation and Maintenance Instructions PYROT 100 to 540 ID 106811 H English ...
Страница 29: ...Leerseite für Notizen Blank page for notes Page en blanc pour des notationes ...
Страница 30: ...Leerseite für Notizen Blank page for notes Page en blanc pour des notationes ...
Страница 31: ...Leerseite für Notizen Blank page for notes Page en blanc pour des notationes ...