Step 22. Reinstall the new small O-ring around both the load and SDS chains.
Step 23. Ensure that both chains are parallel to each other and have NO twists in them when
they are installed into the chain nest. (Refer to Figure 4-19).
Figure 4-19
Step 24. First, the last link of the load chain is installed into the top slot of the chain nest.
The chain must be kept parallel with no twists. The bolt is installed in front of the
last link of the load chain and into the chain nest. (Refer to Figure 4-20)
Figure 4-20
Step 25. Next, the last link of the SDS chain is installed into the bottom slot of the chain nest.
The chain must be kept parallel with no twists. The bolt is installed through the last
link of the SDS and into the chain nest.
Step 26. Reinstall the large O-ring into the groove located on the chain nest.
(Refer to Figure 4-20)
Step 27. Move the small O-ring down so it is just above the top of the chain nest.
Step 28. The cart may now be repowered and tested.