Installation Instructions UFK 1.1100 Ex
KNF Flodos UFK1.1100Ex O&M-Rev2
16
Figure 6: Installing the intermediate
plate
Figure 7: Installing the resonating diaphragm
5.4 Assembling the pump head
Insert the three insert rings (
11
) in the pump housing; see
Figure 3.
For easier installation of the diaphragms (
10
), turn the connect-
ing rod to top dead center, beginning with head I. Tighten the
diaphragms well (
10
) by hand. Repeat the steps for heads II
and III.
For head II, press the middle diaphragm (
10
) to bottom dead
center with your thumb.
Place the head plate (
2
) according to Figure .
Insert the resonating diaphragm support (
3
) and the two O-
rings (
4
) into the head plate (
2
).
Place the resonating diaphragm (
5
) on the head plate (
2
)
according to Figure . Make sure that the cut-out in the resonat-
ing diaphragm (
5
) and the cams in the head plate (
2
) are posi-
tioned correctly.
Insert the six O-rings (
7
) and anchor valves (
8
) in the connect-
ing plate (
6
) according to Figure .
Click the three intermediate plates (
9
) into the connecting plate
(
6
).
Place the connecting plate (
6
) on the head plate (
2
).
Place the complete head on the pump housing. Make sure that
the head sits properly to ensure the desired transfer direction
(direction of arrow).
Insert the eight head screws (
1
) in the head plate (
2
), but
tighten them only slightly for now.
Tighten the four inside head screws (
1
) in a diagonal sequence
by one rotation each.
Tighten the four outside head screws (
1
) in a diagonal se-
quence by one rotation each.
Repeat steps 12. and 13. until all the head screws (
1
) are
tightened to 3.5 Nm. This procedure is important to ensure that
the diaphragm is compressed equally, and the pump is leak-
tight.
Figure 5: Head installation
Содержание UFK 1.1100 EX
Страница 10: ...Installation Instructions UFK 1 1100 Ex KNF Flodos UFK1 1100Ex O M Rev2 10 Fig 2 230V Connection ...
Страница 23: ...www knf com ...
Страница 24: ...Form 5554E Phone 715 675 3311 ...