25
INSTALLATION
INSTALLATION — FINISH WORK
Touch-Up and Inspection
1.
Fill all visible nail holes and/or countersunk screw holes. Clean up any excess wax.
2.
Invite the home owner to inspect the installation.
3.
Give the homeowner the Kirsch
®
warranty card.
4.
Demonstrate proper operation of the shutters (see page below).
5.
Show the customer the location of their individual authenticity plate.
OPERATION AND CARE
Operation
■
■
Tilt the louvers by grasping one louver and moving it.
Do not
use the tilt bar to tilt the louvers.
■
➤
With arches and other specialty shapes, the louvers operate independently. To tilt the louvers, grasp and gently turn. Work
left to right and align all louvers in a sunburst design.
■
■
Open the shutter panel by grasping the stile through open louvers and pulling out.
Do not
use the tilt bar to open the shutter
panel.
■
■
Standard bypass track system must have louvers closed before operating panels.
IMPORTANT:
To open the panels on a Bi-Fold track system, first close the louvers on all panels, then pull the panel closest to the
stationary or pivot side outwards, followed by each successive panel, until the panel is fully stacked.
IMPORTANT:
When using floor guides with a bypass track system, use caution when operating panels to avoid panel damage
where the guides contact the stiles.
Pivot
Hanger
Hanger
Hanger
Snubber
First Action
Second Action
Third Action