•
Inflating Bag-O-
Light
•
It is best to inflate the Bag-
O-Light once it has been
mounted to the light fixture.
•
To inflate, unscrew air cap
on inflator port.
•
Plug inflator fan into
secondary XLR output
located on control box.
•
Place inflator fan into air
input port and press blue
button to turn on fan.
•
A 6-meter bag will inflate in
about 30 seconds.
•
Once bag is inflated quickly
remove fan and secure cap
over port.
•
Inflate the remainder by
depressing inflator valve
located on the control box
at the head or on the power
supply.
7
Pressure Management
System
•
The system is designed to
automatically shut down the
inflator valve once the required
pressure is achieved.
( 40 mbar / .725psi )
•
Do not adjust any settings on
the pressure regulator. They
are factory set.
Inflator
Button