background image

 
 

 

• 

Inflating Bag-O-
Light 

 

• 

It is best to inflate the Bag-
O-Light once it has been 
mounted to the light fixture.

• 

To inflate, unscrew air cap 
on inflator port. 

• 

Plug inflator fan into 
secondary XLR output 
located on control box.  

• 

Place inflator fan into air 
input port and press blue 
button to turn on fan. 

• 

A 6-meter bag will inflate in 
about 30 seconds. 

• 

Once bag is inflated quickly 
remove fan and secure cap 
over port.  

• 

Inflate the remainder by 
depressing inflator valve 
located on the control box 
at the head or on the power 
supply. 

 

 

 

 

 

 
 

 

7

 

 

Pressure Management 
System 

• 

The system is designed to 
automatically shut down the 
inflator valve once the required 
pressure is achieved.                 
( 40 mbar / .725psi ) 

• 

Do not adjust any settings on 
the pressure regulator. They 
are factory set. 

 

Inflator 
Button 

 
 
 

 

Содержание Bag-O-Light

Страница 1: ... 1 Ring clamp 2 Pressure cowling 3 Black tube cover 4 6 meter 20 foot Bag O Light 5 DMX cable 6 Universal Power Supply 7 Power Cord 8 Inflator fan 9 Operating instructions 10 Black cover nose and collar set 11 Air hose 12 Adaptor air hose 1 ...

Страница 2: ...r either Arri or LTM Par 4 HMI s Note When using the shutter Cowling must be fitted with the Arri ring Cowling light shields LTM cowling light shield Inserts between barn door claws Align LTM label with Locking ring ARRI cowling light shield Inserts between barn door claws Align ARRI label with Locking clamp 2 ...

Страница 3: ...ator s instructions Hand Held Shutter Controller This handheld controller allows for smooth fade in and outs The bump button allows for rapid flashing Operators s Manual included 6 Channel DMX Shutter Controller This controller allows for six channels of shutter control 3 ...

Страница 4: ... See accessories page for illustration of adapter rings Align seams of Bag O Light so one side aligns with air cap Stretch the rubber lip of the bag over the opening ensure that the bag material does not get pinched under the rubber lip Position spring clamp over the rubber lip and lock into place It may be necessary to tighten the clamp by adjusting the screw hook on the latch 4 ...

Страница 5: ...ior to inflating the bag attach Velcro collar to the base of the bag and secure it to the ring clamp Once the collar is secured inflate the bag Apply the Velcro nose ring and secure the black cover to the Velcro collar as desired ...

Страница 6: ...ure Auto fill switch will automatically maintain bag pressure A green LED on the power supply will light as soon as the pressure in the bag is ok 10 50 mbar 145 725 psi Red LED indicates low pressure below 10 mbar 145 psi 6 Inflator valve Auto fill switch LED indicator Securing Lamp Head Due to the weight of the Bag O Light it is important to secure the lamp head with additional bracing The yoke l...

Страница 7: ...to turn on fan A 6 meter bag will inflate in about 30 seconds Once bag is inflated quickly remove fan and secure cap over port Inflate the remainder by depressing inflator valve located on the control box at the head or on the power supply 7 Pressure Management System The system is designed to automatically shut down the inflator valve once the required pressure is achieved 40 mbar 725psi Do not a...

Страница 8: ...VAC to the compressor Set the power switch to AUTO The compressor will automatically pump up the reserve tank to about 125 PSI and then shut off Once the Bag O Light is inflated turn off the automatic reload switch on the compressor to ensure that it doesn t turn on unexpectedly during a shot The reserve tank will be able to maintain air pressure in the bag 8 ...

Страница 9: ...ay Burbank CA 91505 USA This symbol on the product or on its packaging indicates that this product shall not be treated as household waste This product is made of recyclable materials and should be disposed of in accordance with local and state regulations Tel 818 767 6528 website www kinoflo com ...

Отзывы: