– Installation Guidelines for BioDisc BA, BAx, BB & NB Units 

    Page  8 

2.3 

Wet Site : 

2.3.1 

Assemble the four anchor bars supplied and insert them into the 
holding down points as shown.

 

2.3.2 

Place concrete back-fill to approximately 200mm above the unit base, 
ensuring good compaction to avoid voids.  

2.3.3 

Do not use vibrating pokers.

  

2.3.4 

Never fill a freestanding tank with water or back fill an empty tank.  
Always fill the tank with water at the same time as the back fill material 
is placed.  

2.3.5 

The water level inside the tank is to be maintained within 200mm of the concrete level during 
backfilling. It is important that these two operations are carried out simultaneously to avoid the risk of 
flotation.  

2.3.6 

Raise the water level inside the unit and concrete back fill to just below the outlet, in 200mm 
increments. 

2.3.7 

Continue back-filling with concrete up to the level of the outlet. 

2.4 

Dry Site : 

2.4.1 

Back-fill to the outlet level with pea shingle (3-8mm), sand or other non-cohesive, non-compressible 
free-flowing granular material. The water level inside the tank is to be maintained within 200mm of 
the backfill level during this process. 

Power Supply

from house

240V 1ph 5A (20A for NB Units)

 (3ph optional)

(RCD protected)

Steel Wire Armoured

Cable supply

to control panel -

Customer Supply

Inlet Pipe

Outlet - Effluent to

Soakaway, Ditch,

Stream etc. via Sample Chamber, if fitted.

Control Panel

(Refer to Section 6

for position)

G.L.

450mm

Inlet Invert

1400mm

All Models

A

d

d

 8

5

m

m

 F

o

R

e

s

p

e

c

ti

v

e

 O

u

tl

e

In

v

e

rt

s

G.L.

G.L.

WET SITE

INSTALLATION 

DRY SITE

INSTALLATION 

Backfill to suit 

Wet Site conditions 

is concrete

min 150mm thick. 

Backfill to suit

Dry Site conditions

(Pea Shingle

or other suitable

free flowing material)

Ballast with water to outlet

(working level) for completion of backfill

Ballast with water to here for first backfill

Concrete, Pea Shingle or

other suitable free flowing

material followed by

topsoil or finish to

suit site requirements

IMPORTANT - ALL GROUND CONDITIONS

Minimum 150mm concrete 

under base of unit.

Concrete must be haunched up

at least 150mm all round

1

8

5

0

m

m

 (

4

5

0

m

m

 I

n

v

e

rt

)

2

6

5

0

m

m

 (

1

2

5

0

m

m

 I

n

v

e

rt

)

2

1

5

0

m

m

 (

7

5

0

m

m

 I

n

v

e

rt

)

95mm

310mm

1995mm

For Dry Ground

Installations

Water Table must

be below this

level at all times

Internal Volumes of Units as an

aid to Calculate Materials

Approx. Weights:

(includes pallet)

Base to Working Water Level

Water Level to Ground Level

1

2

450mm invert

750mm invert

1250mm invert

450mm invert

750mm invert

1250mm invert

3.00m

3.00m

4.75m

7.50m

3

3

3

3

335kg

350kg

405kg

360kg

375kg

430kg

310kg

325kg

380kg

BA

BB

NB

750mm

Inlet Invert

1250mm

Inlet Invert

110mm PVCu outlet socket
 shown. Units with integral
 discharge pipe have 1 ” 
ABS threaded spigot outlet.

¼

 

 

Содержание BioDisc BA

Страница 1: ...ical connection or if there is no power available to operate the unit then the motor with gearbox must be removed and stored in a dry environment The motor keeps dry by generating its own heat when op...

Страница 2: ...d recommended Please contact Kingspan for details of your local service provider Should you wish to inspect the operation of the equipment please observe all necessary precautions including those list...

Страница 3: ...shire HP22 5EW United Kingdom 07 EN 12566 3 BA BF BioDisc Hydraulic daily load 1 2m day 10m day Material GRP Glass Reinforced Plastic Watertightness water test Pass Structural Calculation Pass Treatme...

Страница 4: ...4 2 Mounting Frame Installation where applicable 10 4 3 Installation of Control Panel 10 4 4 Installation of Integral Discharge Pump where applicable 11 4 5 Installation of Sludge Return Pump where ap...

Страница 5: ...owing points should be considered before installation of the equipment 1 3 2 The discharge must have the consent of the relevant Environmental Regulator 1 3 3 The installation should have Planning and...

Страница 6: ...table selection of the cable is the responsibility of the installing electrician Full Load Current Amps BA BAx BB NB Motor 240 volt single phase 0 52 0 52 0 52 0 52 415 volt three phase 0 22 0 22 0 22...

Страница 7: ...of the unit contains this copy of the Installation Guidelines and a cover key 2 2 2 Excavate a hole of sufficient length and width to accommodate the unit and a minimum of 150mm concrete surround and...

Страница 8: ...red Cable supply to control panel Customer Supply Inlet Pipe Outlet Effluent to Soakaway Ditch Stream etc via Sample Chamber if fitted Control Panel Refer to Section 6 for position G L 450mm Inlet Inv...

Страница 9: ...l as described in Section 3 2 4 6 Continue to back fill with concrete wet site or free flowing granular material dry site up to ground level The finished surface should be 95 mm minimum lower than the...

Страница 10: ...et 4 2 2 Allow 350mm minimum clearance from finished ground level to the bottom of the panel 4 3 Installation of Control Panel Figure 1 Control Panel 4 3 1 Remove the four screws on the front of the p...

Страница 11: ...applicable 4 5 1 Using a suitable M20 gland feed the integral discharge pump power cable through Gland Hole 3 Figure 1 and terminate to connection 3 4 TB2 following the guide on Table 2 4 5 2 Set the...

Страница 12: ...crewdriver push switch 10 to the ON position 4 8 Installation of High Level Alarm where applicable 4 8 1 Remove the link in the terminal blocks between connections 11 12 TB6 before inserting cables Us...

Страница 13: ...owing the procedure in the Owners Handbook and leave the unit running even if there is no sewage being fed into the plant 7 1 4 If the unit has been installed with no operational power supply then rem...

Отзывы: