MQZCV48 Basic Finishing 1: With Screen Only (As Shipped)
TO FINISH WALL WITH DRYWALL AND TILE
OR BRICK:
TO FINISH WALL WITH DRYWALL AND
CONCRETE BOARD:
Step 1:
Frame fireplace with nailing tabs oriented as
shown.
Step 1:
Frame fireplace with nailing tabs oriented as
shown.
Step 2:
Use Drywall to finish face of wall.
NOTE:
Drywall will be flush with fireplace face.
Step 2:
Use concrete board to cover face of fireplace.
NOTE:
Leave clearance of 1-3/16” on top and 1-1/16” on
both sides and bottom to install and remove screen.
A Tile Lip Kit is Available. Part No. ZCV-TLK
Step 3:
Apply brick, tile, or other non-combustible material
over fireplace face.
NOTE:
Leave clearance of 1-3/16” on
top and 1-1/16” on sides and bottom to install and remove
screen.
Step 4:
Install Screen. Refer to Screen installation
instructions.
Nailing Tab
1-3/16” MIN
1
-1
/1
6
” M
IN
Drywall
Fireplace Frame
Nailing Tab
1
-1
/1
6
” M
IN
1-3/16” MIN
16
Содержание MQZCV48LP
Страница 20: ...ZCV48 Fireplace Opening Required Clearance ZCV48 Fireplace Opening Required Clearance 20...
Страница 52: ...Gas Conversion for Modulator PART C 52...
Страница 57: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 57...
Страница 58: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 58...
Страница 65: ...Proflame 2 Remote Control 65...
Страница 67: ...67...