
MQZCV48
Framing Dimensions
Determine whether face of fireplace will be:
Flush with finished wall (e.g., for surround, cultured stone or other non combustible covering).
Flush with framing (to be covered with concrete board for a Flat Wall appearance).
Refer to Nailing Tab Guide section also.
56” MIN for NG
68” MIN for LP
Plus Rise of 1/4”
Per Foot*
Vertical Venting MUST maintain 1” clearance to combustibles.
These structures are not load bearing.
RIGHT SIDE
*For Propane Horizontal installations the venting must be an additional one foot above
the minimum vertical rise off the flue before going horizontal.
Vent Framing
(Vertical or
Horizontal)
9” Round Hole
through Masonry.
12” x 12” Framing
for
Combustible.
Optional Recess
3/4” MAX Combustible
material
6”
Framing with Z58DFA and
Hard Pipe
-Side View-
24-9/16”
NOTE:
Depth can be reduced to
23-1/4” if using Flex Venting
13
Содержание MQZCV48LP
Страница 20: ...ZCV48 Fireplace Opening Required Clearance ZCV48 Fireplace Opening Required Clearance 20...
Страница 52: ...Gas Conversion for Modulator PART C 52...
Страница 57: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 57...
Страница 58: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 58...
Страница 65: ...Proflame 2 Remote Control 65...
Страница 67: ...67...