MQRSP5 for MQZDV3318/3622
/ZCV3622
Step 6:
Place rocks #6 into place as shown.
Do not place
directly over the multiple porting areas.
Step 7:
Place rocks #4 into position as shown. Place the
highlighted rocks into position being sure that they are crossing
over the single line porting.
MQRSP5 finished setup and burn.
Step 8:
Place rock #3 and rock #1 into position as shown to
complete the setup. Lava rock and vermiculite are optional for
placement around the rock platform on the burner pan.
Note: If flame impingement on the rocks causes sooting,
you may have to move or remove one or more rocks. Do
not place rocks directly over top of the burner tube.
31
Содержание marquis SKYLINE ZCVRB3622LPE2
Страница 26: ...Optional Log 4 in raised position LOG 4 26...
Страница 43: ...Gas Conversion for Modulator PART C 43...
Страница 49: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 49...
Страница 50: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 50...
Страница 57: ...Proflame 2 Remote Control 57...
Страница 59: ...59...