23
MQRB5143SK (See Thru Kit) Installation
This basic Kit is required for See Thru installations.
Note: If you wish to cover the Side Fillers with non-combustible materials, they must be installed before Facing materials are
applied.
Components:
[2ea.] Side Fillers
Valve Access Cover
Glass Door c/w Glass
See Thru False Bottom
[4ea.] #6 Black Screws
[6ea.] ¼” DT Screws
Installation Procedure:
1. Side
Fillers
Place Side Filler onto Side of
Fireplace opening. Attach with [2]
#6 Screws provided. Repeat for
the other side.
2. False
Bottom
Insert False Bottom into Fireplace.
Fasten the False Bottom to the
Burner Assembly with [6] DT
Screws provided.
3. End
Panels
Remove the Liner Retainer Clips
in the Firebox Top. Place End
Panels into Firebox on top of the
False Bottom and tilt into place at
either end of the Firebox. Replace
the Liner Retainer Clips.
4. Door
Place the bottom of the door into
the door retainer slot, and then
secure the door with the top
latches (See Door and Glass
Information in manual if more
information is required).
5. Valve
Access
Cover
To locate Valve Access Cover,
engage the tabs into the slots in
the Access Panel Brackets on the
Fireplace.
Содержание Marquis Infinite MQRB5143LP
Страница 30: ...30 Millivolt System Lighting and Burner Control...
Страница 39: ...39...
Страница 41: ...41 Photos Bottom of Unit with IPI Module Light Module IPI Valve...
Страница 42: ...42 Close up View of IPI Module Inside of IPI Module...
Страница 43: ...43 IPI Valve IPI Valve...
Страница 44: ...44 Millivolt Valve Light Module Millivolt Valve...
Страница 49: ...49 Venting Examples All horizontal runs have a minimum rise per foot...
Страница 57: ...57 Warranty...