Table of Contents
INFORMATION
Table of Contents……………………………………………………………................................................................. 2-3
Pre-installation Questions and Answers / Operations and Maintenance Instructions............................................. 4
Warnings, Installations, and Operations………………………………….................................................................. 5
Installation Requirements for the Commonwealth of Massachusetts / Carbon Monoxide (CO) Detector.............. 6
Fireplace Installations in Covered Outdoor Locations............................................................................................ 7
Recommendations for Finishing of Clean View Installations.................................................................................. 8
Mobile Home/Manufactured Housing Installation……………………....................................................................... 9
Nailing Tab Guide................................................................................................................................................... 10
ZCV39 / ZCV42 Framing Your Gas Fireplace………………………………………………………………………….... 11
ZCV39
INSTALLATION
Locating Your Appliance / Fireplace Dimensions……………………………………………………………………….. 12
Framing Dimensions………………………………………………………………………………………………………... 13
Clearance to Combustibles………………………………………………………………………………………………… 14
Facing Requirements………………………………………………………………………………………………………. 15
ZCV42 INSTALLATION
Locating Your Appliance / Fireplace Dimensions……………………………………………………………………….. 16
Framing Dimensions………………………………………………………………………………………………………... 17
Clearance to Combustibles………………………………………………………………………………………………... 18
Facing Requirements………………………………………………………………………………………………………. 19
BASIC FINISHING: ZCV39 & ZCV42
Basic Finishing 1:
With Screen Only……………………………………………………………………………………. 20
ZCV39CSS / ZCV42CSS Child Safety Screen Installation…………………………………………………………...... 21
ZCV39 / ZCV42 Surround Installations…………………………………………………………………………………... 22
ZCV39CSS2 / ZCV42CSS2 / ZCV48CSS2 Inside Fit Safety Screens................................................................... 23
VF Surround Installations- Inside Fit Safety Screens…………………………………………………………………… 24
Basic Finishing 2:
With S1 or S1PF Surround…………………………………………………………………………. 25-26
Basic Finishing 3:
Concrete Board Behind S2PF Surround (3/4” Maximum Total Thickness)…………………… 27
Basic Finishing 4:
Stone or Brick Around S2PF Surround…………………………………………………………… 28
Basic Finishing 5:
Tile Border Behind S2PF Surround (3/4” Maximum Total Thickness)………………………… 29
Basic Finishing 6:
With MQZCV42DD & Stone, Brick, or Tile Border……………………………………………..... 30-31
MQZCV39DD / MQZCV42DD Designer Door Installations…………………………………………………………….. 32
ZCV-TLK Optional Tile Lip Kit …………………………………………………………………………........................... 33
39ZCV Mantel Clearances…………………………………………………………………………………………………. 34
42ZCV Mantel Clearances…………………………………………………………………………………………………. 35
ACCESSORIES
ZCV39 / ZCV42 51UHS Box / Component Locations…………………………………………………………………...
36
ZCV39 / ZCV42 Z46FK Fan Kit Installation……………………………………………………………………………… 37
Fan Speed Control Outside of Fireplace…………………………………………………………………………………. 38
ZCV39PL / ZCV42PL Porcelain Liner Installation………………………………………………………………………. 39
ZCV39RL / ZCV42RL Brick Liner Installation……………………………………………………………………………. 40
Cutting Refractory Liners to work with GT Glass Trays.......................................................................................... 41
ZCV39GT / ZCV42GT Glass Tray Setup………………………………………………………………………………… 42
ULK2 Universal Light Kit…………………………………………………………………………………………………… 43-44
LogF3- 7 Piece Setup……………………………………………………………………………………………………...
45
LogC3/F3- 5 Piece Setup………………………………………………………………………………………………….. 46
MQLOGF39BW 7 Piece Birch Log Set…………………………………………………………………………………… 47
MQ42D Setup......................................................................................................................................................... 48-49
RBCB1 Cannonballs……………………………………………………………………………………………………….. 50
MQ Dealer Accessories for ZCV39 / ZCV42…………………………………………………………………………….. 51-53
MQ Log F9 Setup………………………………………………………………………………………………………….... 54-55
2
Содержание marquis BENTLEY ZCV39LPE2
Страница 55: ...Logs 8 10 are placed along Front Grate Lava Rock on Firebox Bottom Embers Insulation Wool On Burner 8 9 10 55 ...
Страница 64: ...Gas Conversion for Modulator PART C 64 ...
Страница 69: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 69 ...
Страница 77: ...Proflame 2 Remote Control 77 ...
Страница 79: ...79 ...