ZCV39 / ZCV42
Basic Finishing 3: Concrete Board Behind S2PF Surround (3/4” Maximum Total Thickness)
Step One:
Frame Fireplace with nailing tabs oriented as shown
(flush with face of fireplace).
Step Two: Use Concrete Board to cover fireplace face.
NOTE: Optional ZCV-TLK Tile Kit is available. Maintain
clearances shown. See bottom drawings also.
Step 3:
Concrete Board with optional Tile Lip shown below.
IMPORTANT NOTE!:
If installing tile, brick, or other non-
combustible material around the perimeter of the S2PF2 Surround,
Maintain clearances shown below. Also See Basic Finishing 4.
Nailing Tab
Optional ZCV-TLK Tile Kit
1-3/16” MIN
1
” M
IN
Concrete
Board
Concrete Board
S2PF Surround
1
” M
IN
1-3/16” MIN
Optional ZCV-TLK Tile Kit
Concrete
Board
Concrete Board
1
-3
/4
” M
IN
1-15/16” MIN
ZCV39
Fireplace
Opening
Required
Clearance
ZCV42
Fireplace
Opening
Required
Clearance
27
Содержание marquis BENTLEY ZCV39LPE2
Страница 55: ...Logs 8 10 are placed along Front Grate Lava Rock on Firebox Bottom Embers Insulation Wool On Burner 8 9 10 55 ...
Страница 64: ...Gas Conversion for Modulator PART C 64 ...
Страница 69: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 69 ...
Страница 77: ...Proflame 2 Remote Control 77 ...
Страница 79: ...79 ...