Gas Conversion Part A ZCV39 / ZCV42
1. The Main Burner must be removed from the Burner Pan
Assembly (See
Burner Removal Section
). Adjust the Air
Shutter to the correct Primary Air setting as specified in
the manual or on the label plate. To adjust the Primary
Air setting, loosen screw on the side of the Air Shutter
and rotate to the correct opening using a drill bit or tape
measure. Retighten screw.
2. Remove the Main Burner Orifice using a ½” wrench and
replace with the new Conversion Orifice which came with
the Conversion Kit.
3.
Replace the Main Burner. Install the new Pilot Orifice (See
Pilot Conversion
) and Hi/Lo valve regulator by following
instructions supplied with the Conversion Kit.
Refer to “
Gas Specifications Chart
” for inlet pressures and input ratings. Clock meter to verify input rate. Place conversion label as
close to converted gas control as possible. Refer to lighting instructions to verify the normal operating sequence of the ignition system.
IMPORTANT: Always check for gas leaks with a soap and water solution. DO NOT USE OPEN FLAME FOR LEAK TESTING.
⚠
-Warning-
This conversion kit shall be installed by a qualified service agency in accordance with the
manufacturer's instructions and all applicable codes and requirements of the authority having
jurisdiction. If the information in these instructions is not followed exactly, a fire, explosion or
production of carbon monoxide may result causing property damage, personal injury or loss of
life. The qualified service agency is responsible for the proper installation of this kit. The
installation is not proper and complete until the operation of the converted appliance is checked
as specified in the manufacturer's instructions supplied with the kit.
⚠
Caution
:
The gas supply shall be shut off prior to disconnecting the electrical power, before proceeding with the conversion.
Pilot Must Maintain This
Relationship With Main Burner.
Pilot Orifice
Main Burner
Air Shutter & Screw
Main Burner Orifice
Brass Nipple
Hi / Lo Regulator
Parts List:
HI/LO Pressure
Regulator Assembly
Pilot Orifice
Burner Orifice
Brass Nipple
Instructions
Conversion Kit Label
62
Содержание marquis BENTLEY ZCV39LPE2
Страница 55: ...Logs 8 10 are placed along Front Grate Lava Rock on Firebox Bottom Embers Insulation Wool On Burner 8 9 10 55 ...
Страница 64: ...Gas Conversion for Modulator PART C 64 ...
Страница 69: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 69 ...
Страница 77: ...Proflame 2 Remote Control 77 ...
Страница 79: ...79 ...