background image

VERTICAL VENT INSTALLATION

21

An Attic Insulation Shield must
be installed where the vent
passes from a lower living space
into an attic space where the
chimney is not enclosed. It is
designed to keep insulation
materials away from the
chimney.

When installing the Attic
Insulation Shield where the
chimney passes from a living
space to an attic space, install the shield from below and nail it in place using 1" spiral nails.

A firestop must be installed on the bottom side of the joists when passing through a ceiling or floor.  If an attic
insulation shield is to be used, a firestop is not required.

One pair (two) 45° elbows may be used to provide an offset in order to avoid cutting of joists and to clear other
obstructions.

When using 45° elbows, an elbow support is required directly above the highest elbow.

When installing a bend in a joist area a minimum of 4” clearance to combustible to the top of bend must be
maintained, sides and bottom of pipe, a 1” clearance to combustibles must be maintained.  If running horizontally
through an area, a 2 1/2” clearance to the top of the horizontal pipe must be maintained.

Maximum vertical height of system should not exceed 40 feet.

There are two vertical vent terminals, one for rises of 8 to 15 feet and another for rises of 15 to 40 feet. Be sure to
use the correct one.

Spacer springs to be installed on 4" flex pipe every 3 ft. on vertical runs.  On 45° elbows or 90° elbows a spacer
spring is needed on the start of the bend and on the end of bend.

Содержание FDV200LP

Страница 1: ...n of R Co Inc 2340 Logan Ave Winnipeg Manitoba Canada R2R 2V3 Ph 204 632 1962 Read this complete manual before beginning installation These instructions must be kept with the unit for future reference...

Страница 2: ...ory However due to the high temperature silicone components the paint will cure when heat is applied to the appliance as it is first used The following information applies to the curing process to get...

Страница 3: ...1 Log assembly 12 Optional fan kit installation 13 Millivolt system lighting burner control 14 Vent termination 15 General venting information 16 Vent pipe assembly 19 Horizontal vent installation 19...

Страница 4: ...nstallation of appliance or venting For required venting components see venting installation in appropriate section of this manual 4 THE FDV200N FDV200PN FDV200LP and FDV200PLP MAY BE INSTALLED IN MAN...

Страница 5: ...or ignition of clothing 3 Children should be carefully supervised when they are in the same room as your fireplace appliance 4 Under no circumstances should this appliance be modified Any parts that...

Страница 6: ...l comply with NFPA 720 2005 Edition B A carbon monoxide detector shall be located in the room that houses the appliance or equipment and shall a Be powered by the same electrical circuit as the applia...

Страница 7: ...he minimum size of Alcove is Depth 30 Height 55 5 Width 52 5 THE FOLLOWING MINIMUM DISTANCES TO COMBUSTIBLES MUST BE OBSERVED TO ENSURE SAFE OPERATION OF YOUR STOVE A B C D E F Minimum distance to com...

Страница 8: ...SIG 3 5 KPa 9 The appliance must be isolated from the gas supply piping system by closing its individual shutoff valve during any pressure testing of the gas supply piping system at test pressures equ...

Страница 9: ...from furniture and draperies Children and adults should be alerted to the hazards of high surface temperatures of this appliance and should stay away to avoid burns or ignition of clothing Control co...

Страница 10: ...burner areas This appliance should not be used as drying rack for clothing nor should Christmas stockings or decorations be hung near it Under no circumstances should any solid fuels wood paper cardbo...

Страница 11: ...Reverse steps 1 2 to re install door REPLACING OF CERAMIC GLASS Follow Removal of Glass Door then clean all materials from door frame Using a high temperature sealant temperature resistant to 500 F 2...

Страница 12: ...n the long branch of Log 2 onto notched area of Log 1 Step 3 Place Log 3 into position as shown in picture and slide Log 3 forward up to the locating tabs 3A 3B Do not place log on top of tabs Step 4...

Страница 13: ...unit reaches operating temperature in approximately 10 to 15 minutes the fan will turn on The fan can be switched off if desired by turning the switch fully counter clockwise 6 Once the fan has start...

Страница 14: ...lot screw to provide proper sized flame Recommended Maximum Lead Length Double Wire When Using Wall Switch or Thermostat Wire Size Max Length 14 GA 100 FT 16 GA 64 FT 18 GA 40 FT 20 GA 25 FT 22 GA 16...

Страница 15: ...rance to perpendicular wall 24 inches 60 cm Recommended to prevent re circulation of exhaust products For additional requirements check local codes V NOTE Clearances are to the edge of terminal plate...

Страница 16: ...2 from top of horizontal pipes 1 on all other existing pipes REMEMBER THAT A 1 4 VERTICAL RISE IS REQUIRED FOR EVERY 12 OF HORIZONTAL RUN Venting terminal shall not be recessed into a wall or siding I...

Страница 17: ...mum stove performance HOW TO USE THE VENT TABLE 1 Determine the height of the system and the number of elbows required 2 Use the Venting Chart to determine the maximum horizontal distance allowed Tota...

Страница 18: ...ure sealant MIL PAC SEALANT IS RECOMMENDED to the pipe and secure it with the 4 screws washers If two pieces of 4 flex pipe are to be joined the joint must be siliconed and secured with screws Before...

Страница 19: ...his may be unavoidable is when installing the vent terminal Note Do not remove or move spacer springs attached to 4 inner flex pipe these must be used to assure an 1 1 4 air gap between 4 and 7 pipes...

Страница 20: ...AL VENTING AIR INTAKE PLATE ADJUSTMENT NOTE Unit comes preset for vertical venting under 15 feet Follow these instructions when venting exceeds 15 feet vertical 1 Locate the 3 x 1 4 hex screws and usi...

Страница 21: ...de an offset in order to avoid cutting of joists and to clear other obstructions When using 45 elbows an elbow support is required directly above the highest elbow When installing a bend in a joist ar...

Страница 22: ...set Support ZDVFS Firestop Spacer ZDVRS Roof Support ZDVSS Siding Shield ZDVWT Wall Thimble Horizontal Venting ZDV48GP Galvanized Pipe 7 Dia x 48 Vertical Installations ZDV4FP8 Flex Pipe 4 Diameter 4...

Страница 23: ...SSEMBLED 199 713 1001 P714SI PILOT TOP CONVERTIBLE NG ASSEMBLED 199 714 1001 P633SI VALVE NOVA LP Hl LO 0820633 or 651 1001 P634SI VALVE NOVA NG Hl LO 0820634 or 652 1001 P216SI THERMOCOUPLE 290 216 F...

Страница 24: ...t the valve from one type of fuel to the other Step 8 Check for gas leaks around the pilot burner tube and face of valve Step 9 Attach conversion label to label plate on bottom of unit writing informa...

Страница 25: ...of the injector 2 and rotate it counter clockwise until it is free of the injector journal 3 5 Verify that the new injector is proper for the application The injector size is stamped on the side of th...

Страница 26: ...als at wall switch If burner comes on replace defective Switch ON wall switch If okay jumper wires across wall switch wires at valve If burner comes on wires are faulty or connections are bad Generato...

Страница 27: ...th service or maintenance h damage repairs inoperation or inefficiency resulting from faulty installation or application i electricity or fuel costs or any increase in electricity or fuel cost whatsoe...

Отзывы: