Step (3)
Locate flat surf
ace on Log (3) and place directly on to
right Ember plate
, push log fully to the left until it touches Log (2)
Step (4)
Remo
v
e Ember mater
ial from plastic bag, tear off dime
and nic
k
el siz
ed pieces and place directly onto front b
ur
ner tube
and crosso
v
er tube
. (NO
TE:
Do not place embers onto rear
b
ur
ner tube)
Step (5)
P
osition Log (4) into g
roo
v
ed areas of Logs (1) and (2).
Step (6)
P
osition Log (5) into g
roo
v
ed area of Logs (1) and (3).
3
4
5
LOGC44 PLA
CEMENT GUIDELINES - FOR MODELS HBZD
V3624/HBZD
V3628
25
Содержание HBZDV3624
Страница 17: ...Fan Installation for HBZDV 36 42 47 17...
Страница 31: ...Pilot Shield RSP1 RSP2 Qty 1 Shield Per Kit Back View 1 2 3 4 5 6 SLOTS SLOTS SLOTS SLOTS 31...
Страница 41: ...Gas Conversion for Modulator PART C WARNING WARNING 41...
Страница 45: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 45...
Страница 46: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 46...
Страница 53: ...Proflame 2 Remote Control 53...
Страница 55: ...55...