Handling the Terminal Block Tray (PCR6000LE2/ PCR9000LE2)

The PCR-LE2 Series AC INPUT, OUTPUT terminal block, SENSING 
terminal block, and J1 to J4 connectors are designed so that they 
can only be wired after you first pull out the terminal block tray. 
The terminal box covers ensure that you don’t touch the unwired 
terminals. Use a Phillips-head screwdriver to insert and remove the 
screws.

 

Check that the POWER switch is turned off.

 

Loosen the six terminal box cover screws, and then 

slide the three covers up.

M3 x 6

 

Remove the two terminal block tray screws, and 

then pull the tray out.

M4 x 2

 

Pull out the stopper to lock the terminal block tray 

in place.

Stopper

 

Connect the wires and cables to the terminal block 

and connectors as necessary.

 

Return the stopper to its previous position.

 

Return the terminal block tray to its previous posi-

tion, and then attach the two screws that you re-

moved in step 3 

If you do not insert the terminal block tray all the way into 
its storage compartment, an electric current will not flow 
through the PCR-LE2 even if the POWER switch is turned 
on.

 

Slide the two terminal box covers down until they 

are touching the wires, and then use the four 

screws to fix the terminal box covers in place. Slide 

the terminal box cover all the way down if none of 

their terminals have wires connected to them, and 

use the two screws to fix the covers in place.

The figure below is an example for when the OUTPUT ter-
minal blocks for single-phase output are in use.

Содержание PCR12000LE2

Страница 1: ...and waveform can be changed over time Power supply environment testing can be automated In addition to the AC output sequences DC output single phase output or single phase three wire output only and...

Страница 2: ...used in the explanations in the manual WARNING Indicates a potentially hazardous situation which if ig nored could result in death or serious injury CAUTION Indicates a potentially hazardous situatio...

Страница 3: ...istance Using Power Line Abnormality Simulations In AC mode you can simulate power supply line errors by stop ping the PCR LE2 output and decreasing and increasing the voltage to simulate voltage dips...

Страница 4: ...t least 20 cm of space between the air inlet outlet and the wall or obstacles Fix PCR6000LE2s and PCR9000LE2s to the floor using L shaped or other similar brackets Base Hold Angles OP03 KRC are availa...

Страница 5: ...block tray in place Stopper 5 Connect the wires and cables to the terminal block and connectors as necessary 6 Return the stopper to its previous position 7 Return the terminal block tray to its prev...

Страница 6: ...the switchboard attach crimping terminals that match the screws of the switchboard that has been connected by a qualified engi neer If you will not use one of the optional input power cords prepare a...

Страница 7: ...ncy 50 Hz or 60 Hz 2 Check that the POWER switch is turned off 3 Unfasten the screws two locations of the AC INPUT terminal block cover and remove the cover 4 Connect the power cords according to the...

Страница 8: ...rs are detected the home position the basic screen appears 0 00 A 0 0 V pk rms AC LOAD 99 00 Hz RANGE L RESP M OUTPUT OFF Turning on the POWER switch on the PCR12000LE2 PCR18000LE2 or 27000LE2 The PCR...

Страница 9: ...ber 63 Output on off state If the POWER switch is turned off immediately after the settings have been changed the last settings may not be stored CAUTION Risk of malfunction After turning the POWER sw...

Страница 10: ...uirements of single core wires that are used to connect to the load Nominal cross sectional area mm2 AWG reference cross sectional area mm2 Allowable current A at Ta 30 C 86 F 0 9 18 0 82 17 1 25 16 1...

Страница 11: ...ill not flow through the PCR LE2 Series even if the POWER switch is turned on Single phase three wire output or three phase out put 1 Check that the POWER switch is turned off 2 Check that the breaker...

Страница 12: ...0 mm2 AWG0 2 or less flip the terminal cover upside down and attach it Single phase output 1 Check that the POWER switch is turned off 2 Check that the breaker of the switchboard is off 3 Unfasten the...

Страница 13: ...shock Before you install the switch between the OUTPUT ter minal block and the load be sure to turn the POWER switch off and turn off the breaker of the switchboard The current rating of the switch mu...

Страница 14: ...s does exceed the limit defined in the SJ T11363 2006 standard The PCR LE2 series is subject to export control laws Trademarks All company names and product names used in the PCR LE2 manual are tradem...

Отзывы: