Warning!
To prevent tipping and avoid potential injury, stakes must
be driven 13” into ground. Digging or driving stakes can be dangerous if you
do not check first for under-ground wiring, cables or gas lines.
A:
In the 5 places shown in fig. 18.1 drive the Rebar Ground Stakes 13” into the ground against (091) Diagonal,
(093) Diagonal, (024) Rock Rail and both (152) SW Posts. Be careful not to hit the washer while hammering
stakes into the ground as this could cause the washer to break off.
B:
Attach ground stakes using 1 (S7) #12 x 2” Pan Screw per ground stake as shown in fig. 18.2.
C:
After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
Step 18: Install Ground Stakes
MOVE FORT TO FINAL LOCATION PRIOR TO STAKING
FINAL LOCATION MUST BE LEVEL GROUND
Hardware
5 x
#12 x 2” Pan Screw
S7
5 x Rebar Ground Stake
Other Parts
Fig. 18.1
F
ig. 18.2
SEE FRONT COVER FOR
SAFETY CLEARANCE
040
093
Rebar Ground
Stake
13”
In Ground
152
S7
Front
021
091
53
Содержание Cedar Summit Canyon Ridge
Страница 113: ...NOTES 113 ...