Step 21: Crowsnest Assembly
Part 2
4 x
#8 x 2” Wood Screw
S11
Hardware
B:
Place the Lower Crowsnest Assembly from Step 19 centred in the opening of (040) Slide End Panel, in
between (210) Crowsnest Bottom Sides, tight to the top of the floor boards then attach with 2 (S11) #8 x 2” Wood
Screws per side. (fig. 21.2, 21.3 and 21.4)
Fig. 21.2
Fig. 21.3
Top View
Fig. 21.4
Inside View
192
Tight
040
192
x 2 per
side
S11
Floor
Boards
x 4
S11
Floor
Boards
040
210
210
59
Содержание Cedar Summit Canyon Ridge
Страница 113: ...NOTES 113 ...