Fig. 39.1
Step 39: Small Roof Assembly
Part 1
Notice pilot holes at
bottom of board
Wood Parts
2 x
Mid Roof Support 1-1/4 x 2-1/4 x 32-3/4”
390
Hardware
1 x
#8 x 3” Wood Screw
A:
Attach 1 (390) Mid Roof Support to a second (390) Mid Roof Support at peak using 1 (S4) #8 x 3” Wood
Screw. Notice pilot holes are at the bottom of the boards. (fig. 39.1)
S4
S4
390
85
Содержание Cedar Summit Canyon Ridge
Страница 113: ...NOTES 113 ...