52 Installation Note N5247-90113
Installation Procedure for the Upgrade
-
5.
Connect the rest of the switch, receiver attenuator, and source attenuator
cables to the test set motherboard. For instructions, click the Chapter 7
bookmark “Removing and Replacing the A23 Test Set Motherboard” in the
PDF Service Guide
1
Route the bias cables
6.
Route bias cables as shown.
—
Separate cables as much as possible.
—
It is OK to cross the cables.
—
Avoid running cables parallel or next to each other.
—
Avoid tie wrapping to semirigid cables.
1. See
Содержание N5247-60113
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 66: ...66 Installation Note N5247 90113 Installation Procedure for the Upgrade ...
Страница 67: ...Installation Note N5247 90113 67 Installation Procedure for the Upgrade ...
Страница 68: ...68 Installation Note N5247 90113 Installation Procedure for the Upgrade ...
Страница 75: ...Installation Note Xxxxx xxxxx 3 ...