background image

Installation Note  N5232-90101   

  9

Installation Procedure for the Upgrade

The network analyzer must be in proper working condition prior to installing this option. Any necessary repairs 

must be made before proceeding with this installation.

WARNING

This installation requires the removal of the analyzer’s protective outer covers. The analyzer 

must be powered down and disconnected from the mains supply before performing this 

procedure.

Overview of the Installation Procedure

Step 1. Obtain a Keyword and Verify the Information.
Step 2. Remove the Outer Cover.
Step 4. Remove the Front Panel Assembly.
Step 5. Remove Some Existing Cables.
Step 6. Assemble the A29 and A30 Source Attenuator Assemblies.
Step 7. Install the A29 and A30 Source Attenuator Assemblies.
Step 8. Install the Cables.
Step 9. Secure the Hex Nuts on the Front Panel Bulkhead Connectors.
Step 10. Remove the Old Lower Front Panel Overlay.
Step 11. Reinstall Front Panel Assembly.
Step 12. Install the New Lower Front Panel Overlay.
Step 13. Install Front Panel Jumpers.
Step 15. Reinstall the Outer Cover.
Step 16. Enable Option 216.
Step 17. Perform Post-Upgrade Adjustments and Calibration.
Step 18. Prepare the PNA for the User.

Содержание N5231A Option 200

Страница 1: ...e Test Set and Source Attenuators Upgrade Kit Installation Note To Upgrade PNA N5231A N5232A or N5239A Option 200 to Option 216 Upgrade Kit Order Numbers N5231AU 216 N5232AU 216 or N5239AU 216 Keysigh...

Страница 2: ...Installation Note N5232 90101 1...

Страница 3: ...al item as defined in FAR 2 101 a or as Restricted computer software as defined in FAR 52 227 19 June 1987 or any equivalent agency regulation or contract clause Use duplication or disclosure of Softw...

Страница 4: ...urements needs and information on finding a local Keysight office are available on the Web at http www keysight com find assist If you do not have access to the Internet please contact your Keysight f...

Страница 5: ...rade adjustments and full instrument calibration To view the equipment list click the Chapter 3 bookmark Tests and Adjustments in the PDF Service Guide1 License Key Redemption NOTE The enclosed Option...

Страница 6: ...rvice Guide is displayed scroll through the Contents section bookmarks to locate the information needed Protecting Your Workspace from Electrostatic Discharge For information click on the Chapter 1 bo...

Страница 7: ...scription Qty Part Number T 10 TORX driver set to 9 in lbs 1 02 N m 1 N A T 20 TORX driver set to 21 in lbs 2 38 N m 1 N A 5 16 in 8 mm nutsetter or open end torque wrench set to 10 in lbs 1 13 N m 1...

Страница 8: ...5232 80005 Front panel jumper cable guard 2 N5242 00029 Dust caps for test ports 2 1401 0214 W11 RF cable A21 MASSY to A29 60 dB step attenuator 1 N5232 20026 W12 RF cable A21 MASSY to A30 test port 2...

Страница 9: ...n this upgrade kit It is normal for some of these items to remain unused after the upgrade is completed Wire harness A19 test set motherboard J8 to A29 60 dB step attenuator 1 8121 0982 Wire harness A...

Страница 10: ...a Keyword and Verify the Information Step 2 Remove the Outer Cover Step 4 Remove the Front Panel Assembly Step 5 Remove Some Existing Cables Step 6 Assemble the A29 and A30 Source Attenuator Assembli...

Страница 11: ...For instructions click the Chapter 7 bookmark Removing the Covers in the PDF Service Guide1 Step 4 Remove the Front Panel Assembly For instructions click the Chapter 7 bookmark Removing and Replacing...

Страница 12: ...le N5235 20040 A4 13 5 GHz Source Synthesizer board to test set deck cable bracket W10 N5232 20081 A24 mixer brick to test set deck cable bracket Step 6 Assemble the A29 and A30 Source Attenuator Asse...

Страница 13: ...specially wire harness connections Incorrect connections can destroy components resulting in additional customer costs CAUTION Be careful not to damage the center pins of the semirigid cables Some fle...

Страница 14: ...32 20031 Figure 3 Location of Cable Clamps to Secure W19 W22 and W23 W19 N5232 20025 A21 MASSY to REF 2 SOURCE OUT As shown in Figure 3 install two cable clamps part number 1400 1334 to secure W19 par...

Страница 15: ...le bracket W12 N5232 20019 A21 MASSY to A30 test port 2 source attenuator W18 N5232 20032 A21 MASSY to REF 1 SOURCE OUT As shown in Figure 4 install one cable clamp part number 1400 1334 to secure W18...

Страница 16: ...connect to the front panel bulkhead These cables were shipped with hex nuts If not already done secure the cable connectors to the front panel bulkhead with the hex nuts torquing to 21 in lbs Step 10...

Страница 17: ...16 Installation Note N5232 90101 Figure 5 Lower Front Panel Overlay Replacement...

Страница 18: ...f the procedure Although a 4 port PNA is shown in the graphic the concept is the same for the 2 port PNA New parts are listed in Table 1 on page 7 1 Remove the protective backing from the new front pa...

Страница 19: ...front panel jumper cables part number N5222 20091 Torque to 10 in lbs Figure 7 Front Panel Jumper Cables Installation Step 14 Reinstall the Inner Cover For instructions click the Chapter 7 bookmark Re...

Страница 20: ...t 4 Using the keyboard enter the license key in the box provided The license key is printed on the the license message you received from Keysight Enter this key exactly as it is printed on the message...

Страница 21: ...structions click the Chapter 3 bookmark Tests and Adjustments in the PDF Service Guide1 If you experience difficulty with the basic functioning of the analyzer contact Keysight Refer to Contacting Key...

Страница 22: ...This information is subject to change without notice Keysight Technologies 2012 2014 August 2014 N5232 90101 N5232 90101 www keysight com...

Отзывы: