18 Installation Note N5225-90107
Description of the Upgrade
Installation Procedure for the Upgrade
-
Step 10. Install Some Bottom-Side (Test Set) Cables
Follow the two instructions shown in
in this document. New parts are
listed in
of this document.
Install the Semirigid Cables
To see an image showing the location of these cables, click the Chapter 6
bookmarks “Bottom RF Cables, 4-Port Configuration, Option 417” in the PDF
Service Guide
1
. New parts are listed in
Install the following new cables in the order listed.
— W103 (N5245-20055) Port 2 RCVR B IN to A49 port 2 receiver
attenuator
— W94 (N5245-20031) A41 port 2 source attenuator to front-panel Port 2
SOURCE OUT
— W33 (N5245-20010) A32 port 2 receiver coupler to front-panel REF 2
SOURCE OUT
, install four clamps (part number 1400-1334) to
secure W33.
Follow instructions carefully when making cable connections, especially
wire harness connections. Incorrect connections can destroy components,
resulting in additional customer costs.
1. See