10 Installation Note N5225-90107
Description of the Upgrade
Installation Procedure for the Upgrade
-
Step 1. Obtain a Keyword and Verify the Information
Follow the instructions on the Software Entitlement Certificate supplied to
obtain a license key for installation of this upgrade. Refer to
.
Verify that the model number, serial number, and option number information
on the license key match those of the instrument on which this upgrade will be
installed.
If the model number, serial number, or option number do not match those on
your license key, you will not be able to install the option. If this is the case,
contact Keysight for assistance before beginning the installation of this
upgrade. Refer to
“Contacting Keysight” on page 2
Once the license key (A models) or license key file (B models) has been
received and the information verified, you can proceed with the installation at
“Step 2. Remove the Outer Cover” on page 10
.
Step 2. Remove the Outer Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the
PDF Service Guide.
Step 3. Remove Some Bottom-Side (Test Set) Cables
1. Place the analyzer bottom-side up on a flat surface.
2. Remove the following cables. To see an image showing the location of
these cables, click the Chapter 6 bookmark “Bottom RF Cables, Standard
4-Port Configuration, Option 401” in the PDF Service Guide
1
.
These cables may be discarded - they will not be reinstalled.
— W12 (N5245-20109) A29 port 1 receiver coupler to W11
If the model number, serial number, or option number do not match those
on your license key (A models) or license key file (B models), you will not
be able to install the option. If this is the case, contact Keysight for
assistance before beginning the installation of this upgrade. Refer to
“Contacting Keysight” on page 2
.
Leave the gray flexible cables, the wire harnesses, and the ribbon cables
connected where possible. Any that are removed should be labeled for
reconnection later.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables may be necessary but do not over-bend them.
1. See