Installation Note
N9020-90239
43
Installation Procedure
Final Installation for Standard Instruments
(Benchtop Configuration,
)
1. Refer to
. Carefully slide the instrument cover back onto the instrument from the rear of
the analyzer, making sure not to damage any internal cables. The seam on the cover should be on
the bottom of the instrument. Be sure the cover seats into the gasket groove in the Front Frame
Assembly.
2. Replace the four rear feet
(4)
to the rear of the instrument using the four screws
(3)
.
Torque to 21 inch pounds.
3. Replace the strap handles
(2)
on both sides of the instrument using the four screws
(1)
.
Torque to 21 inch pounds.
4. Replace the four instrument bottom feet.
5. Replace the four key locks to the bottom feet.
Final Installation for Portable Instruments
(Option PRC,
1. Refer to
. Carefully slide the instrument cover back onto the instrument from the rear of
the analyzer, making sure not to damage any internal cables. The seam on the cover should be on
the bottom of the instrument. Be sure the cover seats into the gasket groove in the Front Frame
Assembly.
2. Refer to
. Replace the four rear bumpers
(2)
to the rear of the instrument using the four
screws
(1)
. Torque to 21 inch pounds.
3. Refer to
. Replace the four hole plugs
(5)
to both sides of the instrument.
4. Refer to
. Replace the bail handle
(2)
(using the four screws
(1)
) to the Front Frame
Assembly. Torque to 21 inch pounds.