18 Verification
Table 2-5. Constant Current (CC) Tests (continued)
Action
Normal Result
CC Source Effect
This test measures the change in output current resulting from a change in ac line voltage from its minimum to its
maximum value within the line voltage specifications. It is recommended that you use averaged readings for Steps 6 and 8
of this test (see "Averaging AC Measurements" at the end of this chapter) .
1
Turn off the power supply and connect the ac power input through a
variable-voltage transformer.
2
Set the transformer to the nominal ac line voltage. Connect the DVM
across the current monitoring resistor (see Fig. 2-3).
3
Turn on the power supply and program the current to its full-scale value
and the voltage to its maximum programmable value (see Table 2-2).
4
Set the Electronic Load to CV mode and its voltage to full scale.
The power supply output current is full
scale and its
CC
annunciator is on. If
not, reduce the Electronic Load voltage
slightly until the annunciator comes on.
5
Adjust the transformer to decrease the ac input voltage to the low-line
condition (180Vac or 360Vac).
6
Observe the DVM reading. Divide this voltage by the resistance of the
current monitoring resistor to obtain the output current. Record the result.
You may want to use an averaged
reading for this measurement.
7
Adjust the transformer to increase the ac input voltage to the high-line
condition (235Vac or 440Vac).
8
Observe the DVM reading. Divide this voltage by the resistance of the
current monitoring resistor to obtain the output current. Record the result.
You may want to use an averaged
reading for this measurement.
9
Check the test result.
The difference between the current
readings found in Step 6 and Step 8 is
within the specified current Source
Effect limits.
Содержание 669 A Series
Страница 2: ...Service Manual Keysight Series 669xA GPIB DC Power Supplies ...
Страница 3: ......
Страница 27: ......
Страница 56: ...Troubleshooting 53 Figure 3 15 3 Inch Front Panel Frame Assembly ...
Страница 57: ...54 Troubleshooting Figure 3 16 Assembly A10 Exploded View ...
Страница 58: ...Troubleshooting 55 Figure 3 17 Assembly A10 Exploded View 6690A ...
Страница 59: ...56 Troubleshooting Figure 3 18 Assembly A10 Exploded View 6691A 6692A ...
Страница 60: ...Troubleshooting 57 Figure 3 19 Three Phase Line Choke Subchassis Wiring ...
Страница 61: ...58 Troubleshooting Figure 3 20 24 Volt Fan Transformer ...
Страница 77: ...74 Diagrams Figure 6 1 Test Point Waveforms for Table 6 3 sheet 2 of 2 ...
Страница 79: ...Figure 6 3 A1 Front Panel Board Assembly Diagram ...
Страница 81: ...Figure 6 5 A2 GPIB Board Component Location ...
Страница 83: ...Figure 6 7 A3 FET Board Component and Test Point Location ...
Страница 87: ...Figure 6 11 A4 AC Input Board Component and Test Point Location 12 9 10 11 ...
Страница 89: ...Figure 6 13 A5 DC Rail Board Component and Test Point Location 13 14 ...
Страница 91: ...Figure 6 15 A6 Bias Board Component and Test Point Location 15 16 17 18 19 19 20 22 ...
Страница 94: ...Figure 6 17 Power Mesh Schematic Diagram All Models ...
Страница 103: ......