Performance Verification
6
N2750/1/2A User’s Guide
63
Test 2. Bandwidth
Refer to the list of required equipment in
on page 60. In the following
procedure, the E2655B is shown in the pictures. You could also use the N5443A
PV fixtures which uses a slightly different lead clamp.
NOTE
Allow the probe to warm up for at least 20 minutes.
NOTE
To ensure accurate measurements, the VNA must warm up for 90 minutes.
Calibrate the Test Setup
1
Turn on the E8361A/C VNA and press the
[Preset]
key.
2
Connect an N2776A Differential Browser Tip to the probe amplifier that is being
tested.
NOTE
The probe that is being tested must have an N2776A probe tip installed for
this measurement. Do not attach any other probe tip.
3
Install the 50-ohm BNC terminator to the VNA’s rear-panel
PORT 1 BIAS INPUT
.
This provides a DC 50 ohm termination for the probe amplifier’s output later in
this procedure.
4
Connect a USB cable between the calibration module and one of the VNA’s
front or rear-panel USB connectors as shown in
.
Figure 43
Connecting Calibration Module’s USB Cable
Содержание N2750A
Страница 1: ...Keysight N2750 1 2A Differential Probes User s Guide ...
Страница 28: ...28 N2750 1 2A User s Guide 1 Using the Probes ...
Страница 34: ...34 N2750 1 2A User s Guide 2 SPICE Models Figure 16 SPICE Model ...
Страница 38: ...38 N2750 1 2A User s Guide 2 SPICE Models ...
Страница 42: ...42 N2750 1 2A User s Guide 3 Probe Calibration ...
Страница 54: ...54 N2750 1 2A User s Guide 5 Performance Data Plots Figure 35 Frequency Response Common Mode ...
Страница 56: ...56 N2750 1 2A User s Guide 5 Performance Data Plots Figure 38 Frequency Response Common Mode ...
Страница 66: ...66 N2750 1 2A User s Guide 6 Performance Verification Figure 45 Probe Connected to Probe Adapter not to scale ...
Страница 74: ...74 N2750 1 2A User s Guide 6 Performance Verification ...