NETCOM2P Installation Guide
3
Installation Steps ...cont’d
3.
On the CIM circuit board, place a jumper on J12.
4.
Connect the ribbon cable from the HDR1 terminal on the CIM circuit board to the H2
terminal on the control board. See Figure 1 or Figure 3. The H2 terminal provides
power to the CIM and the NETCOMP.
5.
Ensure the control board has power.
6.
If the control board is newly installed and this is the first time it is powered up,
restore the factory defaults as outlined depending on the version of PC109x control
board:
J16 Jumpers – after applying power, place a jumper ON J16—pin H, then
momentarily place a jumper ON J1—Clear Memory to load the factory defaults.
Allow approximately 2 minutes and do not make any changes while the control
board re-configures. Remove the jumper from J16—pin H.
S1 and S3 Switches – After applying power, press S1, wait 5 seconds, and then
press S3 within 10 seconds to load the factory defaults. Allow approximately 2
minutes and do not make any changes while the control board re-configures.
7.
Connect the RS-232 serial cable from the laptop or PC to the COM2 terminal block on
the CIM circuit board.
8.
Turn on the laptop or PC connected to the CIM circuit board.
9.
Select start > All Programs > Keyscan NETCOM Program Tool > Keyscan NETCOM
Program Tool.
10.
From the Keyscan NETCOM Utility screen, click on Program NETCOM Device.
11.
From the Select NETCOM Device Type screen, click on the Program NETCOM2 Family
of Boards button.
12.
From the Program NETCOM2B, NETCOM2 & NETCOM2P Boards screen, enter the IP
address, the Subnet Mask and, if applicable, a Gateway.