1.13 BOILER CLEARANCES AND CONNECTIONS
The following minimum clearances must be
maintained for operation and servicing.
Front of boiler - 450mm
Sides of boiler - 25mm
Above boiler - dependent upon the flue
system see drawings
Below boiler - 300mm
Clearance between multiple boiler
installations - 25mm
500
59
59
209
299
118
118
FLOW &RETURN CONNECTIONS
81
GAS & CONDENSE OUTLETS
68
B
A
850
FLOW
RETURN
GAS
CONDENSE
Boiler
Dim. A
Dim. B
45, 55
360
130